Climate: Featured Story
Coverage from Thailand Business News, Macau Business, and others
Schneider Electric Launches Hong Kong EV Charging and Storage

Schneider Electric introduced its EVlink Pro DC 720 charger and Schneider Boost Pro battery energy storage system in Hong Kong on 27 November 2026. The charger is rated for up to 720 kW and supports charging as many as 12 vehicles simultaneously; the storage system scales from 200 kWh to 2 MWh. The launch was accompanied by the start of a high-power charging deployment at Asgard EV's Chai Wan site, addressing demand while helping commercial sites manage available power.
If you read one thing
Covers both product specifications and the initial Chai Wan deployment in a clean, focused account.
The announcement describes the Chai Wan installation as the first local commercial and industrial deployment and says it has commenced operations. The supplied coverage repeats the company’s announcement; it does not provide independent information on usage or further deployments.
EVlink Pro DC 720 is rated for up to 720 kW and can support as many as 12 vehicles simultaneously, with dynamic load management distributing power among vehicles.
Boost Pro is described as scalable from 200 kWh to 2 MWh and as a way for commercial and industrial sites to store surplus renewable electricity, reduce peak demand, and supplement available site power.
Schneider Electric says the first local commercial and industrial deployment has commenced operations at Asgard EV’s Chai Wan site, with the company providing local support services.
